|
Product Detail :
|
Construction of 18 Nos. Pedestrian subways with Pre-Cast RCC Boxes at various locations between TLNR and ALU stations, in connection with increasing sectional speed to 130 Kmph. Pre-Cast RCC Box, Ordinary Portland Cement 43 grade, Steel reinforcement, Geosynthetic composite concrete canvas mat, 5HP diesel pump, Temporary girder, quarry dust, height gauge, collection well with pumping room
|
| Tender Detail : |
Construction of Pedestrian subway-18 Nos. with Pre-Cast RCC Box at various
locations between TLNR and ALU stations in VM-TPJ (chord line) section,
connection with the increasing of sectional speed to 130 Kmph. |