Product Detail :
|
Construction of boundary wall alongside the track (on both sides) at various
locations for a total length of 82.66km between Talanallur and Sillakkudi stations
in VM-TPJ (chord line) section, in connection with 130kmph speed.
|
Tender Detail : |
Construction of boundary wall alongside the track (on both sides) at various
locations for a total length of 82.66km between Talanallur and Sillakkudi stations
in VM-TPJ (chord line) section, in connection with 130kmph speed. |