|
Product Detail :
|
The project involves the re-girdering of steel girders in Bridge No. 342 DN with new metallised steel girders on the CV bridge at Km 388/200-700 in the SA-ED section. Additionally, it includes the strengthening of the existing Arch Bridge No. 87 (18 x 9.14m) on the DN line and the rebuilding of 36 minor bridges in the JTJ-ED section. Steel girders, galvanized H-Beam steel sleepers, elastomeric pads, various P.Way materials, light weight non-metallic planks, heavy duty FRP pultruded tie angles, single flange wheels, light weight push trolley, track linking materials, and other related construction materials.
|
| Tender Detail : |
The project involves the re-girdering of steel girders in Bridge No. 342 DN with new metallised steel girders on the CV bridge at Km 388/200-700 in the SA-ED section. Additionally, it includes the strengthening of the existing Arch Bridge No. 87 (18 x 9.14m) on the DN line and the rebuilding of 36 minor bridges in the JTJ-ED section. |