Product Detail :
|
Construction of approach portion except railway portion obligatory spans of two-lane road over bridge rob at 04 four level crossings for lc no. 17c 3t at ir chainage 1126 21 23, lc no. 18c 3e at ir chainage 1130 9 11, lc no. 21c 3e at ir chainage 1139 3 5, lc no. 23b 3t at ir chainage 1146 33,1147 01, including viaduct spans, approach road as per irc standard between shw etw stations and tdl cnb section division of north central zonal railway.
|